What Excavation & Grading Looks Like Here.
Most of the grading problems we get called out to fix are not dramatic. Water sits where it should not, a pad settles unevenly, a driveway washes out every spring. All of it traces back to grade that was guessed at instead of shot.
Grade gets shot before work starts, not after. That is the whole difference between a pad that drains and a pad you argue about for the next ten years.
Rough grading gets the shape right and the water moving. Finish grading gets the surface ready for whatever goes on top, whether that is a slab, a driveway, gravel, or seed.
What That Actually Means
- 01Grade shot first
Measured before the first bucket, so drainage is designed rather than discovered.
- 02Cat 310 excavator
The main dirt machine, also the one carrying the grapple saw on tree jobs.
- 03Cat D3K2 dozer
Steel tracks for pushing and shaping on ground that will not hold a wheeled machine.
- 04Written plan before the work
You get the scope in writing after the site visit, before anything is committed to.
How a Job Runs
- Call, then text. Send over your name, the address, and a few lines about the job.
- We walk it with you. On-site visit, grade shot where it matters, boundaries agreed.
- Written estimate. Detailed, and left with you before we pull out of the driveway.
- The work, then a clean finish. Ready for the next phase, not for the next contractor.
Estimates are free on some jobs and not on others. Tell us what you have when you call and you will know before anyone heads your way.